Longsun · Dubai, UAE · DET licence 1628064

Drop it anywhere.
It makes its own power.

Integrated solar and storage EPC, plus Energy Pods, portable power and other new-energy products, with energy solutions sized to the load at factories, warehouses, mines, labour camps, site offices and building sites across the UAE.

Project referencesCSCEC Middle EastCNNC Project 594JBD Sharjah Free ZoneWhite Rock MineralsAl Baraa Group

SCROLL TO EXPLORE THE PODSee core specs →
01 — ROOF SOLAR

The roof is the power plant.

A gable roof extends out on both sides for looks and shade. It carries ten 640 W monocrystalline modules, 6.4 kWp in all, and the structure is designed for the module load and for the crews who install and maintain them.

02 — SOLAR YIELD

About 9,700 kWh a year.

Based on PVGIS satellite irradiance data for the Middle East, and allowing for heat, system losses and dust, the 6.4 kWp roof system is expected to generate about 9,700 kWh a year for lighting, office equipment, air-conditioning and other site loads.

03 — SMART SUPPLY

Solar first.
Storage next.
Generator as backup.

The energy management system (EMS) uses solar first and stores the surplus in the battery; only when solar and storage fall short does it start the generator.

04 — INSIDE

One cabin, everything the site needs.

A 6 × 3.6 m cabin with the inverter, 15 kWh of storage, water recycling and a separate washroom built in, ready for site office work and power.

05 — STORAGE

15 kWh of storage.
More flexible supply.

LiFePO₄ batteries store the daytime surplus and supply power when solar falls short. Capacity is sized to the actual load.

06 — WATER

Recycled water, less site plumbing.

Handwash water is filtered, disinfected and reused, and the separate washroom uses a waterless microbial system, so the pod relies less on external water and sewer connections.

07 — PROTECTION

Insulated, protected, easy to move.

75 mm three-layer fire-resistant insulated panels suit site conditions. When the project ends, the whole pod moves on to the next site.

08 — CORE SPECS

Energy Pod · core specifications

Main configuration below; contact us for the full specification.

Cabin size
6 × 3.6 × 3 m standard; moves as one unit for redeployment
Wall & roof panels
75 mm three-layer fire-resistant insulated panels
Roof PV
Shallow gable overhanging both sides; ten 640 W monocrystalline modules (1134 × 2380 mm), 6.4 kWp; expected yield about 9,700 kWh a year
Carport add-on
0–10 more modules, up to 6.4 kWp; roof and carport together up to 20 modules, 12.8 kWp
Storage
LiFePO₄, 15 kWh standard, 5 / 10 / 15 kWh options; about 6,000 cycles; switches over automatically when solar falls short
Inverter & EMS
Hybrid inverter with an energy management system (EMS): solar first, storage next, generator as backup
Water recycling
Handwash water is filtered, disinfected with ozone/UV and reused, about 20–50 L a day; top-up and servicing depend on the number of users
Washroom
Separate cubicle with a waterless microbial system; designed for about 5 users a day, 3–6 month treatment cycle
Protection & environment
IP65; operating temperature −20 to 60 °C
Design life & upkeep
PV modules 25–30 years; storage about 6,000 cycles; inverter 3–5 years; structure 30 years; modules need regular cleaning

Energy Pod · capacity

Capacity,
sized to the site.

The roof comes with 6.4 kWp of PV and 15 kWh of storage as standard. With the carport, PV goes up to 12.8 kWp; storage can be set from 5 to 15 kWh.

Drag the sliders to see the configuration and expected yield.

PV capacity6.4 kWp
Roof · 10 modules · 6.4 kWpCarport add-on · 0/10
6.4 kWp standard (roof)12.8 kWp with carport
Expected yearly yield
≈ 9,700 kWh
Summer daily average
≈ 30 kWh
Winter daily average
≈ 20 kWh
Storage capacity15 kWh
5 kWh15 kWh standard
Usable
13.5 kWh
Reference runtime at 1 kW
≈ 13.5 h
Cycle life
6,000 cycles

Modules drawn at 1134 × 2380 mm and 640 W. Generation from PVGIS data for Dubai (estimated as flat-mounted, less 5% for dust); usable energy at 90% depth of discharge. Final layout, pitch, overhang and wind design are confirmed per project.

Energy Pod · where it goes

Site offices.
Labour camps.

Site offices

Office and AC, powered on the spot.

Roof solar and storage built into the site office run the lights, computers and air-conditioning, cutting reliance on diesel power.

Reference load
About 28 kWh a day in summer and 10 in winter for one container office (estimate)
What we deploy
An Energy Pod as the site office: 6.4 kWp of roof PV + 15 kWh of storage, up to 12.8 kWp with a carport
Reference
CNNC 22 · Project 594: carport solar + storage retrofit, 135 kWp PV + 232 kWh storage
Labour camps (24 h)

Store by day, supply by night.

PV and storage are sized to the accommodation's AC, lighting and usage hours to cover the evening and night; a backup generator fills any gap.

What we deploy
Rooftop or ground-mount PV with storage sized to the camp's night load; the EMS starts a backup generator for any gap
Reference
Alas Crusher labour camp: 150 kW PV + 464 kWh. Emirates Gabbro mining labour camp: 200 kW PV

02 · Solar + Storage EPC

Idle space today.
Free power tomorrow.

We build solar and storage systems sized to the site on factory and warehouse roofs, carports and open ground, with one team from survey and design through installation, commissioning and O&M.

Commercial rooftop solar array with the Dubai skyline behind
≈ 1.67 GWh/yrExpected yield of 1 MWp of PV
≈ AED 733k/yrExpected yearly saving against grid power
≈ AED 3.33M/yrExpected yearly saving against diesel power (fuel cost)

Example: a 1 MWp project in Dubai on assumed tariffs and yield: about 1,665 kWh per kWp a year (PVGIS); grid power at the DEWA commercial rate of about AED 0.44/kWh including the fuel surcharge; diesel at about AED 2/kWh fuel cost, with all generation used on site. Actual savings depend on self-consumption, load, losses and running costs.

Dubai: DEWA Shams Dubai net meteringAjman, UAQ, RAK, Fujairah: EtihadWE Distributed Solar SchemeSharjah: SEWA scheme
  1. Site surveyUsable area, structural condition and how the site uses power.
  2. System designPV, storage, inverters and the system layout.
  3. Quotation & paybackA proposal, quotation and payback estimate based on your actual tariff or diesel cost.
  4. InstallationEquipment installation, cabling and protection.
  5. CommissioningTesting, acceptance and handover documents.
  6. O&MMonitoring, cleaning schedules and fault response.

Twelve months of O&M are included after commissioning.

Solar + Storage EPC · diesel cost

Cut diesel spend with solar and storage.

Solar carries the daytime load and storage covers the night, so the generator runs less and burns less fuel.

AED 4.801

UAE retail diesel price per litre for October 2026, revised monthly; a year earlier it was AED 2.71.

≈ AED 22

Fuel cost of one kWh from a site generator (about 1.6 at full load, 3.0 at light night loads). Generator hire, servicing and labour are extra, so diesel power costs more in total.

≈ AED 0.443

DEWA commercial tariff for grid-tied comparison (about 38 fils plus a fuel surcharge of about 6 fils).

1 UAE Fuel Price Committee, via Khaleej Times. 2 AGG P22D5 / Perkins 404A-22G1 datasheet, 0.33–0.63 L/kWh × AED 4.80. 3 DEWA commercial tariff and fuel surcharge.

Solar + Storage EPC · how power flows

Solar first. Storage next.
Generator as backup.

Solar supplies the load first and stores the surplus; when solar falls short, storage takes over, and the backup generator starts only when needed.

Shown: an off-grid or hybrid system with a backup generator. Grid-tied projects may not need one.

PV ARRAYkWp – MWpROOF · CARPORT · GROUND BACKUP GENSETAUTO START WHEN NEEDED EMS SMART DISPATCH STORAGELiFePO₄ · kWh – MWhCABINET · CONTAINER SITE LOADPRODUCTION · ACLIGHTING · OFFICES

PV first · surplus to storage · storage at night · backup generator only when needed

Solar + Storage EPC · where it goes

Factories and warehouses.
Mines and remote sites.

Factories & warehouses

Use idle roofs to cut production power costs.

Grid-tied PV or solar + storage, matched to your usage hours and roof, lowers grid or diesel power spend.

Sizing
Sized to usable area and load
What we deploy
Grid-tied, hybrid or solar-plus-diesel systems, on roofs or ground
Reference
Al Baraa Group, 281 kWp + 445 kWh; Royal Excellent Steel & Cement, 306 kWp; Liviano Foods, 227 kWp
Quarries, crushers & remote sites

Remote sites, less diesel.

PV, storage and a backup generator for mines, crushers and remote sites cut fuel use and fuel deliveries.

Design basis
Load list, generator records and fuel consumption
What we deploy
Ground-mount PV with containerised storage under the same EMS logic; Energy Pods for site offices and gate cabins
Reference
White Rock Minerals mining site: 700 kW ground-mount PV + 2 MWh storage

Solar + Storage EPC · reference loads

Typical site loads.

Initial estimates only; actual use depends on equipment power, numbers and running hours.

Show reference figures
LoadSummerWinterBasis
Power-tool userkWh per worker per 10 h shift2.52.5Grinders, rotary hammers and saws draw 1–2 kW and run about 15–25% of a shift.
Site office cabinkWh a day per 18–22 m² cabin, day use28102-ton split AC (Gulf sizing of 90–100 BTU per sq ft), 4–6 PCs, lighting, kettle and fridge.
LED floodlightkWh a day per 150 W fitting, 11 h a night1.651.65Night work or security lighting.
Always-on equipmentkWh a day: CCTV, Wi-Fi, gates at 0.3–1 kW around the clock7–247–24A common load that still needs power at night.

Diesel per kWh. A 20 kVA set burns about 0.33 L per kWh at full load and 0.6 L or more at the light loads typical of night-time (AGG P22D5 / Perkins 404A-22G1 datasheet: 2.9, 4.0 and 5.3 L/h at 50, 75 and 100% load).

These are estimates. Cooling is modelled for 40–46 °C summer days and typical cabin insulation. At survey we replace them with your generator logs, fuel receipts and equipment list.

Solar + storage EPC · sizing calculator

Enter the load and working hours.
Get a solar + storage size.

Enter the site's average load and daily working hours to see the expected energy use and a PV and storage size. Results are for initial sizing only.

The average power while running, not the sum of every device's rated power.
Working hours
Enter a start and end time, e.g. 08:00–18:00, not a number of hours. Overnight works too, e.g. 20:00 to 06:00 the next day.
Running time10 h
Expected daily use1,000 kWh
Inside / outside solar hours900 / 100 kWh
9 h inside solar hours · 900 kWh, mostly direct solar1 h outside · 100 kWh from storage and backup
Initial sizing
PV array225 kWp≈ 374,625 kWh a year
Storage120 kWhcovers ≈ 100 kWh a day outside solar hours
Expected cut in diesel fuel spend≈ AED 672,000 a yearSolar + storage carries about 92% of the load · diesel fuel at AED 2/kWh
ItemToday, diesel onlyWith solar + storage

Estimated from the assumed diesel cost and load. Equipment, O&M and backup generation costs are not included. The actual share is confirmed in detailed design.

Discuss this sizing
How it is calculated

Energy use is the average load times the working hours. PV is sized from irradiance data and storage from the energy needed outside solar hours. Results are for initial sizing; the real system depends on the site, season, equipment power and backup requirements.

  • PV: PVGIS SARAH3 data for Dubai, 10° tilt, 14% system losses, about 1,665 kWh per kWp a year.
  • Share: an hour-by-hour simulation of a typical day in each month, with 90% usable storage and about 96% one-way efficiency; haze, dust and load swings fall to the backup generator.
  • Fuel spend: about AED 2 of fuel per diesel kWh, excluding generator hire, servicing and labour. Unused surplus solar is not counted as a saving.
  • CO₂: about 0.9 kg per diesel kWh.

Project references

UAE project references.

Carport with solar roof at the CNNC Project 594 campSite photo
Construction · carport solar

CNNC 22 · Project 594

Carport solar + storage retrofit: 135 kWp PV + 232 kWh storage.

Solar panels at dusk on the CSCEC Middle East R1181 siteSite photo
Construction · pilot

CSCEC Middle East · R1181

3 PV modules + a 5 kWh portable power unit for stand-alone power at small sites.

Long factory roof covered with solar modules in SharjahSite photo
Industrial · Sharjah

JBD · Sharjah Free Zone, phase 1

Factory rooftop PV cutting diesel power spend, ready for later expansion.

Crew fixing solar modules on a steel roof frameSite photo
Industrial · Umm Al Quwain

AIRPRO Steel Pipe

Rooftop PV pilot at a steel pipe plant, with a 100 kW system planned next.

Ground-mounted solar rows below mountains at a mining siteSite photo
Mining · ground mount

White Rock Minerals

Ground-mount PV at a mining site: 700 kW PV + 2 MWh storage.

Design layout of solar arrays on labour camp roofsDesign layout
Mining · labour camp

Emirates Gabbro

Labour camp rooftop PV, 200 kW.

Design rendering of solar modules on a long accommodation blockDesign layout
Camp · solar + storage

Alas Crusher labour camp

Labour camp solar + storage: 150 kW PV + 464 kWh storage.

Satellite view with planned solar layout on factory roofsDesign layout
Industrial · food processing

Al Baraa Group

Food plant solar + storage: 281 kWp PV + 445 kWh storage.

Satellite view with planned solar layout on a food factoryDesign layout
Industrial · food processing

Liviano Foods

Grid-tied PV for a food plant, 227 kWp.

Satellite view with planned solar layout on a steel and cement plantDesign layout
Industrial · steel & cement

Royal Excellent Steel & Cement

Grid-tied PV for a steel and cement plant, 306 kWp.

The listed projects, at different stages, add up to about 2.0 MW of solar and 3.1 MWh of storage.

03 · Portable power · SS series

Portable power.
Plug in and go.

SS-01 portable power station
SS-01

1 kWh

Light and portable, for lighting and small devices.

Example: a 60 W LED work light for about 14 hours (at about 85% usable energy).

Output
1200 / 2000 W
Cycle life
≥ 3,000
Reference charge time
≈ 2 h
Rating
IP21 · under cover
SS-03 portable power station
SS-03

3 kWh

For common power tools and site work.

Example: about 2 hours of full-load use on a 1.2 kW rotary hammer (at about 85% usable energy).

Output
3600 / 5000 W
Cycle life
≥ 3,000
Reference charge time
≈ 2 h
Rating
IP21 · under cover
SS-05 portable power station
SS-05

5 kWh

For high-power tools and air-conditioning.

Example: about 2.8 hours on a 1.5 kW grinder, or about 3.9 hours on a 1.1 kW air-conditioner (at about 85% usable energy).

Output
5000 / 7000 W
Cycle life
≥ 3,000
Reference charge time
≈ 2 h
Rating
IP21 · under cover
SS-07 stacked portable power station
SS-07

7 kWh

More capacity for longer use.

Example: a 2 kW load for about 3 hours (at about 85% usable energy).

Output
3500 / 6000 W
Cycle life
≥ 6,000
Reference charge time
≈ 1.5 h
Rating
IP21 · under cover
ON SITE

Charge centrally.
Work anywhere.

Charge at an Energy Pod or site solar hub, then take the power to floors, roofs and other work points, with fewer long cable runs.

Fuel
No fuel and no exhaust in use
Output
Pure sine wave

Portable power · temporary site power

One portable unit
per work crew.

For floors, roofs and scattered work points that temporary power has not reached. Capacity and numbers are set by tool power, how often tools run and how long the work lasts.

Example setup
One SS-05 (5 kWh) for a crew of 3–5, as an example
What we deploy
SS-series portable units recharged at an Energy Pod or site solar hub; pure sine wave output
Reference
CSCEC Middle East, R1181 pilot: 3 PV modules + a 5 kWh portable unit

On site.

Rooftop solar frame and a portable unit on a Dubai building site in daylight
Rooftop work power
Night shift lit by LED floodlights running from a portable power station
Night-work lighting
Interior fit-out crew cutting with power tools on battery power
Interior fit-out power
Crew installing rooftop solar mounting with a portable power station
Equipment installation power

Credentials

Registered in Dubai.
Backed by Shenzhen HQ.

Commercial licence · Dubai DET

1628064
Company
Longsun Solar Energy Systems Installation L.L.C
Issued
4 June 2026
Valid to
3 June 2027
  • Power stations contracting & repairing
  • Alternative energy equipment installation & maintenance
  • Electromechanical equipment installation & maintenance
  • Electrical fitting contracting
  • Steel constructions contracting
  • Pre-fabricated concrete houses contracting

Shenzhen headquarters

Our headquarters has delivered commercial and industrial rooftop PV, distributed solar and storage projects for factories, industrial parks, commercial buildings and mines in China. Longsun brings that design, installation and project-management capability to the UAE.

Project and procurement documents

Available at each project stage:

  1. 01Licence and licensed activities
  2. 02Product specifications
  3. 03Site survey and load analysis
  4. 04Technical proposal, quotation and payback estimate
  5. 05Commissioning records and handover documents

Questions engineers ask

Questions you may have.

Can an Energy Pod power air-conditioning?

Yes, it can be configured for AC. Whether it covers a full day depends on the AC's power, hours of use, insulation and the solar and storage capacity. We size it to the actual load and add carport PV or a backup source where needed.

Do we still need a generator?

Off-grid projects can keep a generator as backup, depending on the load and how reliable the supply must be. The system uses solar and storage first, so the generator runs less.

How does it cope with heat and dust?

Equipment is chosen for its operating temperature and protection rating, with ventilation, shading and regular module cleaning. Portable units must be kept out of rain and water; follow the product manual.

Does the pod need water and sewer connections?

Water recycling and a waterless washroom reduce the need for external connections. Top-up, cleaning and servicing depend on the configuration and the number of users.

How is a system sized?

We confirm the load, usage hours and site conditions, then size the PV, storage and backup power, and send a technical proposal and quotation.

Where do you work?

We are based in Dubai and serve all emirates of the UAE. Contact us to confirm a specific project.

Is the site survey free?

Yes. We survey the site, review your power needs and return an initial proposal and quotation.

Next step

Tell us about your power needs.

Send site photos, an equipment list, a power bill or diesel records, and we will arrange a survey and come back with a configuration and quotation.

Get a proposal and quotation

Interested in

This opens your email or WhatsApp with the details filled in. Check them, then press send.